Case Study

^

Sector: Offshore – oil and gas Benefits: Quick mobilisation Small footprint Reduced schedule The project: The Mega Jack was utilised for this project because of its high capacity and ability to accommodate for the lack of space on worksites. As there was limited yard space available, ALE was limited with how much equipment they could […]

aerial view of bridge installation

Case Study

^

SECTOR: Civil KEY BENEFITS: Multiple installation techniques Coordination with several project teams Eased congestion THE PROJECT: In San José, Costa Rica, to double the capacity of the existing bridge from two lanes to four, ease congestion and increase the capacity of a section of the highway, ALE has used its multiple installation techniques to install […]

Slug Catchers in Saudi Arabi

Case Study

^

SECTOR: Oil and Gas KEY BENEFITS: Extensive equipment fleet Long track record of transporting heavy loads Swift and effective co-ordination with third parties International branch network THE PROJECT:  Using its experience of transporting heavy loads over long distances, ALE has been able to transport the heaviest items ever moved through Gijon and the heaviest to […]

wind installation services

Case Study

^

Overview ALE has successfully completed the electro-mechanical installation of seven wind turbine generators (WTGs) for the Garayalde wind farm, Argentina.   Services Required ALE worked with the crane team to implement the mechanical works and the assembly of the components by their global electro-mechanical installation team. ALE’s electro-mechanical installation team, comprised of fully-trained installation specialists, […]

ALE truck during 2,000km transportation across Saudi Arabia

Case Study

^

Overview ALE is the first heavylifting company to attempt and transport two transformers almost 2,000km over mountainous terrain to Al Farsha Substation in the south west of Saudi Arabia.   Services Required As the route was so complex and had never been attempted before, the client tasked ALE with finding a feasible solution for transporting […]

Case Study

^

Overview ALE has completed the transportation and load-out of a living quarters module, weighing 3,190t, for the Martin Linge platform, using SPMTs with a lowered capacity at a shipyard in Sweden.   Services Required The area at the quay had a ground bearing pressure of 7t/m2. Based on this and a geotechnical report from tests […]

crane lifting in Iraq

Case Study

^

Overview ALE has completed the lifting of a flare stack, weighing 56t, in Iraq.   Services Required The final weight of the flare stack was more than expected and exceeded the capacity of the client’s crane. ALE was asked to mobilise its 600t capacity crawler crane quickly and at short notice. ALE lifted the flare […]

Case Study

^

Overview ALE has successfully installed the new Manston Lane railway bridge, consisting of nine 30m W10 PCC beams; seven inner beams, weighing 70t each, and two edge beams with precast deck included, weighing 140t each, Leeds, UK. Services Required Due to the high frequency of the trains on the tracks, ALE could only work for […]

suctions anchors being lifted by crane

Case Study

^

Overview ALE has demonstrated its efficiency when performing the lifting and load-out of four suction anchors, weighing between 185t-220t, for the Zohr gas project in Alexandria, Egypt.   Services Required ALE had a tight timeframe to complete the manoeuvres and needed to ensure that all remaining port operations could continue uninterrupted. At the Port of […]

Mega Jack installation in Australia

Case Study

^

Overview ALE successfully lifted both halves of the central arch of the new Matagarup Bridge, weighing 400t each, in Perth, Australia.   Services Required The steel components (aka wishbones), measuring 120m long x 35m wide, were carefully transferred from the site in Burswood onto barges on the Swan River. The barges, fitted with temporary towers, […]