ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation

Smarter

INNOVATIVE THINKING FOR EFFECTIVE SOLUTIONS

Safer

A RESPONSIBLE, CARING ORGANISATION

Stronger

THE FLEXIBILITY OF WORLDWIDE RESOURCES

ALE Heavylift

Case Studies

Sector:

Service:

Equipment:

Location:


Case Studies

Showing 193 Case Studies in

20160613_152352_New

Case Study

^

  Overview ALE has successfully launched the 23rd section of a concrete aqueduct in the province of Córdoba, Argentina.   Services Required The section weighed 5,750t and measured 575m long. This makes it the longest concrete structure to be launched by any company in Argentina.   ALE launched the section in stages of 25m at […]

1 (5)

Case Study

^

  Overview ALE has performed the transportation of an STS crane, weighing 800t, within the terminal of Port Nou in Barcelona.   Services Required The crane was transported from its original location to its new location and placed onto the rails. Prior to the transportation, ALE welded the transport brackets on-site. These were specifically designed […]

1

Case Study

^

  Overview ALE has skidded two STS cranes at Termont Terminal in Montreal, Canada.     Services Required  The first crane, IR1401, weighed 680t and the second crane, IR1920, weighted 980t. The skidding was carried out using the SS300t skidding system (300t skidshoes, 300t push-pull hydraulic units and skid tracks and spreader mats). The 300t […]

P9070680

Case Study

^

Overview ALE has loaded-in and transported three modules to their final position for the INPEX Ichthys Onshore LNG Project in Darwin, Australia.   Services Required The three modules compromised of one stair tower, one platform and one sphere, which weighed 600t. ALE received the modules and transported them to site using 32 axle lines of […]

image 5

Case Study

^

  Overview ALE have transported eight large fabricated tanks 5km to the client’s lolo, where they would be taken by barge to the GLNG Project on Curtis Island.     Services Required ALE were tasked to transport eight large fabricated tanks 5km from Gladstone Pressure Welders to the client’s lolo in Gladstone.   Prior to […]

ALE transporting the 280t gas turbine through the deserts of Uzbekistan, between Zarafshan and Navoi.

Case Study

^

Overview ALE have successfully completed the land transportation of a 280t gas turbine from Ersai yard in Kazakhstan to Tashkent Thermal Power Plant in Uzbekistan. This is the heaviest load ever moved in the Caspian region by ALE.   Services Required ALE were contracted to perform the transportation as part of the Tashkent Thermal Power […]

montajepuente25demayo 11 12-10-2014 198 ALTA1

Case Study

^

Overview ALE has successfully completed the installation of a steel bridge, weighing 155t, over Avenida General Paz and 25 de Mayo in Buenos Aires. Services Required ALE was tasked to mount a new steel bridge whilst avoiding any obstruction to the heavy vehicle flow on one of the most used highways in Buenos Aires – […]

Transport of BOP and LMRP offshore equipment in Las Palmas, Spain

Case Study

^

Overview: ALE has successfully completed the transportation of offshore equipment: the BOP, weighing 247t, and the LMRP, weighing 135t.   Services Required: Firstly, the old LMRP was transported from the ship to dock end, then to the offshore platform. Both the new LMRP and BOP modules were then transported from the heavylift ship to the […]

Lifting of three bridge sections over the viaduct of Ulla River image 4

Case Study

^

Overview: ALE performed the lifting of three bridge sections over the viaduct of Ulla River in Galicia. The weights ranged from 10,964t to 12,462t. Services Required: Located between Catoira city (province of Pontevedra) and Rianxo (province of A Coruña), the viaduct has a distance of 1,620m between abutments. The bridge sections weighed 10,964t, 11,900t and […]

Firth of Fourth

Case Study

^

Overview: In August 2014, ALE started the launch of the south approach viaduct to the third bridge over the Firth of Forth in Edinburgh, Scotland. Services Required:   This viaduct has two symmetric decks, with a total weight of 3,150t and a length of 543m each. The launching operations of each structure were divided in six […]