A selection of our most recent case studies are outlined below. 

 

  • Gove Alumina Refinery Alcan G3 Expansion ProjectDuring a six-month period, ALE transported around 75,000te as part of the G3 expansion of Alcan Gove’s alumina refinery in Australia’s Northern Territory.
  • Civil Alcantara Alcántara Dam, SpainALE was engaged to assist with the construction of a viaduct on La Plata highway over the Tajo River. The viaduct consists of two main sections with a total length of nearly 400 metres. The sections were supported over concrete pillars rising...
  • Load Out Baku BOS Shelf, AzerbaijanALE was awarded the contract to supply and operate an external barge ballast and de-ballast system for 6 jackets ranging from 14,000 to 18,000 tonnes as part of the ACG Full Field Development in the Caspian Sea.
  • Load Out Buzzard Buzzard Field Development Project, UKALE successfully completed various works associated with the Buzzard Field Development Project. The project culminated with the load-out operation of the QU Deck with a total load-out weight of 11,300te.
  • Enchantment of the seas 2 Enchantment of the Seas, The NetherlandsWhen ALE's client embarked on the revitalisation of their luxury cruise ships, they approached ALE to assist with the lengthening of M/S Enchantment of the Seas in the Netherlands.
  • Escravos Escravos Gas-to-Liquid Project, NigeriaALE has been heavily involved in the EGTL Project, offloading, transporting and installing all items onsite over 100te with a wide range of equipment including an 80m high gantry; a 4,000te capacity tailing frame; 1,500te, 500te and 300te capacity...
  • Skidding_viaduct Estrecho de Paredes viaduct, SpainALE completed the launch of the Estrecho de Paredes viaduct, which bypasses the Estrecho de Paredes gorge and is part of a new highway in the province of Cuenca, Spain.
  • Projects PDVSA 2 Expansion of FCC Punta Cardón Refinery, VenezuelaALE managed several operations for the FCC refinery of Punta Cardon including the transportation of a new reactor; the site movement of a new domo; and the removal of the existing stripper, absorber, reactor, regenerator, fractionator and domo.
  • Gabbard 8329 Greater Gabbard, UKThe Greater Gabbard wind farm, located in the North Sea, will consist of 142 wind turbines with a total capacity of around 500MW when it’s completed.
  • Bridge Jacking 2 Jack-up and installation of a bridge, GermanyALE was contracted to jack-up and install a 560te bridge in Berlin, Germany. Over the course of one day, the bridge was jacked from its construction position to an elevation of 4.9 metres using four climbing jacks.
Page: [1] [2] [3]