ALE breaks two records whilst transporting and loading out process platforms, Indonesia

ALE has successfully completed the transport and load-out of five modules for the Oil and Natural Gas Corporation Limited (ONGC) ICP-R Process Platform Project in Jakarta, Indonesia.

This is a double milestone project for ALE, firstly for load-out execution of the main structural frame, as this is the heaviest piece loaded-out using SPMTs in Indonesia. 

The second, the transport, and load-out of a Process Generator Compressor Module, which became the tallest piece to be load-out using SPMTs in South East Asia at 45 meters in height.

A total of 154 axle-lines and 18 ballasting pumps were used to complete the project. ALE provided full engineering support on transport, mooring design checks, barge ballasting and analysis.