ALE was contracted for the handling and transportation of a 95te stinger in Cape Town harbour, South Africa.
The stinger was received under hook directly onto the trailer. The 95te load was then transported from Elliot Basin to A-berth using 28 axles-lines of SPMT.
Access into the multi-purpose terminals of A-berth, was made safe by the SPMTs manoeuvrability around sharp corners.