ALE performs engineering and ballasting for Kinabalu KNPG-B project load-out.
A collaboration between ALE Malaysia and ALE - Offshore Services, the scope of work included detailed engineering, control and supervision of the ballast system for the load-out of the 5,500te KNPG-B jacket. In addition, ALE provided engineering and oversight for a complex strand jack pulling system, including for the strand jack brackets and the deadman anchor design.