Case Studies

Sector:

Service:

Equipment:

Location:


Case Studies

Showing 192 Case Studies in

IMAG1863

Case Study

^

Overview ALE completed the load-out of the Eldfisk 2/7s topside modules in Stord, Norway.   Services Required The project spanned over 12 months and involved weighing, jacking, SPMT site moves, load-ins and the final load-out of the completed modules. The weights of the various modules ranged from 1,600t to 11,500t. The final operation involved the […]

A9RC94E

Case Study

^

Overview ALE has successfully executed the replacement of three heat exchanger modules in Rotterdam, The Netherlands.   Services Required ALE was contracted by New Energy Services to undertake the replacement of three modules, an Economizer weighing 20t, and two Evaporators weighing 6t and 21t. The equipment used included multiple telescopic boom cranes and caterpillar skates […]

Valemon South Korea

Case Study

^

Overview ALE has successfully performed the weighing and load-out of the Valemon topside at the Geoje shipyard in South Korea. The topside, which weighed 10,700t, was built on supports on a concrete track around 20m from the quayside. The equipment used for the weighing and load-out included 750t loadcells, 500t and 650t skidding equipment and […]

Erlangden job

Case Study

^

Overview The jack-up, transportation and installation of a railroad bridge, weighing 800t and measuring 74m long, over the A3 highway near Erlangen in Germany, has been successfully completed by ALE. Services Required Jacking the bridge Built on supports, the railroad bridge was jacked-up by 2m using climbing jacks. Afterwards, two 12-lines and two 6-lines of […]

Carl Ulrich job

Case Study

^

Overview The installation of the Carl-Ulrich bridge in Offenbach am Main, Germany, has been successfully completed by ALE. Services Required Jacking up the bridge and preparing the transportation Weighing 1,100t and measuring 150m long, the new bridge was built on the quayside. The bridge was jacked up 1.6m using four 500t capacity climbing jacks. 48 axle […]

lift4

Case Study

^

Overview ALE installed an accommodation module, weighing 1,538t, and a service module, weighing 702t, on the Petrobras P-74 FPSO site in the Petrobras shipyard. Services Required The challenge was to achieve this in the shortest possible timescale in order to maximise the cost efficiency of the project. The engineering solution was the use of the […]

CAR-04 5

Case Study

^

Overview ALE has successfully completed the jacking and skidding of two STS cranes in Terminal Rio de la Plata, Buenos Aires. The cranes weighed 1218.3t and 1138t. Both were 65m high,16.4m between legs and 18.5m between sides.   Services required The manoeuvre required the jacking and skidding of the two cranes from their operation site […]

DSC07938

Case Study

^

Overview ALE has completed the lifting and skidding of the TBM ‘Cristina’ in Escobar, near the Parana de las Palmas River in Buenos Aires. Services Required The seven parts of the TBM weighed between 10t and 69t.  These were lifted 15m and skidded approximately 17m to the transport module. The lifting of each item was […]

P1010829

Case Study

^

Overview The roof of the eight-storey Centro Cultural Bicentenario in Buenos Aires has been successfully skidded by ALE. Services Required The 1500t roof is a Vierendeel type structure measuring 52m x 50m x 5m. The skidding took place in tandem with the manufacturing of the roof.  Each roof section was assembled on site and then […]

222

Case Study

^

Overview ALE has successfully installed the Sylwin Alpha, an offshore platform weighing 14,000t.  ALE provided all necessary equipment and control systems to perform the float-over ballasting during the installation operation in the North Sea. The platform was transported from the Warnemünde fabrication site in Germany, where it had been constructed on-board the barge before being […]

© 2017 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti Modern Day Slavery Statement | ALE Terms & Conditions