ALE performs transport and installations at Soporcel Plant in Portugal.

The condenser, steam turbine and steam generator weighed 62te, 176te and 118te, respectively. Each was approximately 10 metres long, 4 metres wide and 4 metres high. All were transported 600 metres from the storeage area to the turbine building using SPMTs and then lifted to a vertical position under a skidding gantry. HLS700 strand jack lifting units with a 70te capacity were used to lift the modules between 3 and 25 metres. The modules were then skidded to their final installation axis using the gantry, and were lowered and fitted onto foundation supports.