Super M2 Rig Hull, UAE

ALE carried out engineering works for the sea-fastening, ballasting, load0out and float-off of the Super M2 Rig Hull using a semi-submersible vessel.

ALE's team of naval architects and structural engineers provided engineering supervision, mooring calculations, barge deck strength analysis, semi-submersible longitudinal frame analysis, ballast calculations for roll-on and float-off, bollard pull calculations, sea-fastening calculations, semisubmersible stability analysis and marine management.

Following on from the engineering works, ALE then successfully completed the transportation, load-out and float-off of the 5,250t Super M2 Rig Hull 109.