ALE undertook a full turnkey project to transport, barge and install evaporators weighing 2,000te from Hamriayah to Fujairah in the UAE.
ALE’s team of naval architects and engineering specialists carried out a range of services including ballasting, sea-fastening, barging, transportation from jetty and positioning onto foundation. In addition to 76 SPMT axles, ALE used their own London registered, fully ballastable 76-metre barge, the ALE 250. The ALE 250 is equipped with winches, ballast pumps, integral load-out ramps and all machines and equipment required for sea-fastening heavy lift cargo.