ALE was awarded the contract to install 33 heavy loads for a refinery in Russia. The heaviest vessel weighed 372te and measured 38.4m in height x 4.4m in diameter.
The load travelled from the harbour to site using 40 axles of SPMT. The journey included a 10% slope.
Finally, the vessels were erected and installed on site using the ALE's CC2800 crane, in heavy lift configuration, and SPMT trailers with a tailing frame.