ALE was contracted to receive and transport four waste heat boilers from Richards Bay Port South Africa.
The 135te boilers were received on two separate 9 axle trailer combinations. ALE then transported the loads in convoy via the abnormal route through Swaziland to site where the waste heat boilers were off-loaded.