Overview

ALE has successfully installed 24 gas components at a new degassing station in Rafidiyah Zubair, Iraq.

Services Required

The 24 components comprised of eight dehydrators, five flare KO drums, four separators, three radiant sections, two receiver columns, a nitrogen snuffing column and a hot oil expansion drum. The components weighed between 30t – 130t each.

Once all components were in their final positions on site, ALE installed them using a CC2200 350t capacity crawler crane. In order to comply with the relocating restrictions on site, the crawler crane was assembled in two separate locations.