Installation of a module, Argentina

Overview

ALE has completed the installation of the third liner module at a nuclear power plant in Buenos Aires, Argentina.

 

Services Required

The module was installed at the CAREM 25 nuclear power plant in Lima.

ALE installed the module using three cranes: a 1,200t capacity crawler crane, and 250t capacity and 95t capacity all terrain cranes.

ALE lifted the module from the assembly area at a 45m radius and installed it at a 60m radius.

It took approximately one month to complete.