Launching of a viaduct over the Júcar River, Spain

Overview

ALE has performed the launching of a bridge, weighing 1,800t, over the Júcar River in Valencia, Spain.

 

Services Required

ALE designed a launching solution that meant the bridge only needed to be reinforced in specific areas, rather than the entire structure. This also reduced the amount of civil works needed. This saved time, as well as making the whole operation more cost-effective.

ALE manoeuvred the steel arch bridge, measuring 200m long, in 16 phases using 120 axle lines of SPMT in pairs under the previously installed supports. This reduced the need for configuration changes and did not exceed the permissible tautness limits of the bridge.

The SPMTs were relocated to prevent any interferences from the abutment, piles or river.

 

Lanzamiento de un viaducto sobre el río Júcar, España

 

Resumen

ALE ha realizado el lanzamiento de un puente, con un peso de 1.800t, sobre el río Júcar en Valencia, España.

 

Servicios requeridos

ALE optó por una solución de lanzamiento que permitía reducir los refuerzos a áreas específicas del puente. Lo que redujo la cantidad de obra civil necesaria. Esta solución supuso un considerable ahorro de tiempo, optimizando la rentabilidad de toda la maniobra.

ALE realizó el lanzamiento del puente de arco de acero, con una longitud de 200 metros, en 16 fases, utilizando 120 líneas de SPMT ubicados en parejas bajo soportes previamente instalados. Esto redujo los cambios de configuración de SPMT evitando sobrepasar los límites de tensión admisibles del puente

Los SPMT se reubicaron para evitar interferencias del estribo, las pilas y el río.