ALE loads-out 385te Livorno T20 module in Jebel Ali.

Prior to mobilising the equipment to the site, method statements and engineering calculations were prepared and submitted to meet requirements from both the client and the independent Marine Warranty Surveyors. The Livorno T20 module was transported from the assembly yard to the quayside using 24 axles of SPMT and then loaded-out onto a class 330 barge, where it was lowered onto pre-positioned stillages. ALE was also responsible for barge management operations during load-out, including mooring and ballasting.

 