Disruption-free load-out and load-in of four STS cranes in Algeciras, Spain

Overview

ALE has performed the transportation of three cranes, weighing 1,800t each, and one crane, weighing 1,250t, at a container terminal at the Port of Algeciras, Spain, using load-out and load-in techniques.

 

Services Required

ALE transported the three 1,800t cranes from the East Pier to the North Pier and the 1,250t crane from the South Pier to the North Pier.

Each of the STS cranes was transported using 88 axle lines of SPMT. They were supported by four transport brackets, which ALE installed inside the cranes.

The cranes were loaded-out onto a vessel. They were attached using specialist sea fastening that ALE had designed.

For the load-in, two Ro-Ro ramps were used to bridge the gap between the vessel and the loading pier.

By completing the transportations by sea, ALE was able to minimise disruption at the terminal.

 

 

Carga y descarga de cuatro grúas STS en Algeciras, España

 

Resumen

ALE ha realizado el transporte carga y descarga de tres grúas, de 1.800t cada una, y una grúa de 1.250t, en una terminal de contenedores en el Puerto de Algeciras, España.

 

Servicios Requeridos

ALE transportó las tres grúas de 1.800t desde el Muelle Este hasta el Muelle Norte y la grúa de 1.250t desde el Muelle Norte hasta el Muelle Sur.

Cada grúa STS se transportó usando 88 líneas de SPMT y dos vigas de transporte donde se apoyaban las grúas con las 4 ménsulas de transporte instaladas por el interior de las grúas STS.

Las grúas fueron cagadas y fijadas al buque mediante un sistema sea fastening diseñado especialmente por ALE para la maniobra.

El transporte marítimo supuso una solución óptima para minimizar la alteración en la operativa de la terminal.

 

 

 

 