Site Transportation of bridge deck, Norway

 

Overview

ALE has transported a timber pedestrian bridge deck in Egersund, Norway.

 

Services Required

 

ALE worked in conjunction with Nordic Crane to transport a bridge deck, weighing 70t, in the town of Egersund.

 

ALE utilised 12 axle lines of SPMT to self-load and transport the bridge deck to the pick-up position. The route involved transporting the bridge deck around very tight, confined areas during a road closure.

 

Once it was in position, Nordic Crane used a twin crane lift to install the bridge deck.