Transportation and installation of a de-ethaniser tower, Argentina

Overview

ALE has successfully transported and lifted a de-ethaniser tower, weighing 80t, as part of the Axion Energy Refinery Expansion Project in Campana, Argentina.

 

Services Required

The tower, measuring 43m long, was transported 2.7km from its storage area to the installation area, inside Axion Energy Refinery, using 12 axle lines of conventional trailers and two spacers.

ALE then lifted the tower using the LR1400 as main crane and an LTM1250 as tailing crane to position the tower vertically and into its final position.

The expansion project involves the construction of a new gas plant at the Axion Energy Refinery, and the tower is just one of the nine pieces of equipment being transported and lifted there.

ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation

  • Transportation and installation of a de-ethaniser tower, Argentina

Related Case Studies

© 2017 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti Modern Day Slavery Statement | ALE Terms & Conditions