Transportation of a turret head, Malaysia

Overview

ALE has successfully performed the on-site transportation of a turret head, weighing 180.6t, in the Malaysia Marine Heavy Engineering (MMHE) yard in Johor, Malaysia.

 

Services Required

ALE transported the turret head 3km from the fabrication yard to the final erection area using 20 axle lines of SPMT. ALE completed the move in 30 minutes.

 

This was the second of four units that ALE has been contracted to move for the same project.