Tug T310 transportation, South Africa

ALE successfully transported a 750te, Tug310, from its manufacturer’s warehouse onto a submersible dock in Durban, South Africa.

The Ro-Ro operation, involving several engineering solutions, was completed within several hours whilst the dock was carefully ballasted.

The tug was jacked up, transported and jacked down in the port using 32 axle-lines of SPMT.