ALE has successfully unloaded two coal plant pieces, weighing 80t and 114t, in Omaha, USA.

 

Services Required

The pieces were delivered to the plant by train.  Once received, ALE transported the pieces to an assembling area using 14 axle lines of hydraulic platforms.

The pieces were unloaded using two gantry ‘A’ frames, with four hydraulic lifting units of 70t capacity on top.