Smarter

INNOVATIVE THINKING FOR EFFECTIVE SOLUTIONS

Safer

A RESPONSIBLE, CARING ORGANISATION

Stronger

THE FLEXIBILITY OF WORLDWIDE RESOURCES

ALE reaches first milestone for Yamal LNG project in Belgium

« Back to news

Overview

ALE is currently contributing to the trans-shipment operations of the Yamal LNG Project’s Modular Intermediate Storage Yard (MISY) at the Port of Zeebrugge in Belgium.

ALE’s scope on Yamal LNG project encompasses services for:

  • Load-in of modules shipped from Asian fabrication yards
  • Jack-down and storage of the modules in a dedicated laydown yard
  • Load-out of the modules for onward shipment to Sabetta

 

 

 

ALE’s and the joint venture’s Project Director, Filippo Anello, said: “We have been working on this project since the very early preparation stages in 2015, and it is fantastic to see how much we have achieved at this milestone one year after. I’m extremely proud of the teamwork and professionalism shown during the execution of the project, as well as the good synergy and partnership with our client. We look forward to the successful completion of the logistics phase of the Yamal LNG project, which has demonstrated our ability to manage a project-specific joint venture and a wide-ranging scope of work”.

Yamal LNG is an integrated project encompassing natural gas production, liquefaction and shipping. It requires the construction of a liquefied natural gas (LNG) plant at Sabetta on the Yamal peninsula and will have an output capacity of around 16.5 million tons per year, using the South Tambey Field as a resource base.

Click here to read the full story.

ALE Heavylift, Smarter, Safer, Stronger, ale, ALE, abnormal load engineering, heavy crane lifting, heavy transportation

Case Studies

© 2017 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti Modern Day Slavery Statement | ALE Terms & Conditions