Your Javascript is switched off and this website requires Javascript to function correctly, therefore you are viewing a version with reduced functionality.

Case Studies

Sector:

Service:

Equipment:

Location:


Case Studies

Showing 745 Case Studies

ship repairs taking place with a line shaft transported on SPMT

Case Study

^

SECTOR: Ports   KEY BENEFITS: Short notice mobilisation Reduced schedule Flexibility   PROJECT: A rapid response from ALE enabled urgent ship repairs to be assessed and performed quickly, with ALE completing the operation ahead of schedule. Urgent ship repairs needed to be assessed and despite it being over the Christmas holiday period in France, ALE […]

offshore jack-up of a topside for an oil platform

Case Study

^

SECTOR: Offshore   KEY BENEFITS: Bespoke solution Co-ordination with third parties Minimised disruption Equipment debut in Russia   PROJECT: ALE completed the jack-up, skidding and load-out of an offshore platform for the third development stage of the Vladimir Filanovsky oil field, the largest in the Russian section of the Caspian Sea. The field currently produces […]

Case Study

^

SECTOR: Offshore   KEY BENEFITS: Transverse load-out track record In-house naval expertise Management and co-ordination of simultaneous operations   PROJECT: ALE’s experience in combining multiple load-out scopes, including strand jack pulling, barge ballasting and mooring, was instrumental to ensuring the safe and successful load-out of two 7,000t topsides in Sohar, Oman. The project’s greatest challenge […]

record-breaking heavy haulage transportation with truck turning a corner in icy weather conditions

Case Study

^

SECTOR: Minerals and Metals   KEY BENEFITS: Record for Kazakhstan Cost-effective Minimised disruption Flexible   PROJECT: ALE performed the furthest and longest land transportation ever completed in Kazakhstan, deploying its specialist transport services to complete the complex 3,400km transportation of five Out of Gauge (OOG) items, each measuring up to 42m long. The capabilities of […]

Case Study

^

SECTOR: Oil, gas and petrochemical   KEY BENEFITS: Swift mobilisation   PROJECT: ALE helped to keep the Great River project schedule in Mississippi, USA, on time by quickly mobilising its expertise and USA-based SPMT fleet. Five pressure vessels weighing a total of 200t were critical to the Great River Project and were due to be […]

Case Study

^

SECTOR: Shipyards   KEY BENEFITS: Expert maritime monitoring Short notice mobilisation Swift operation   PROJECT: ALE’s maritime expertise enabled them to overcome the challenges of tidal variations at a shipyard in the Netherlands. It meant they were able to swiftly complete a load-in operation within a narrow timeframe. The day before the load-in, ALE installed […]

Case Study

^

SECTOR: Renewables – Wind   KEY BENEFITS: Reduced schedule Minimised disruption Flexibility   PROJECT: ALE reduced the operational schedule during the transportation of six specialist offshore wind columns, weighing 700t-900t, at a shipyard in Setubal, Portugal. The columns needed to be transported 800m from a fabrication area to a dry dock where they would be […]

one smaller gantry on top of another, moving power plant equipment from outside a power plant

Case Study

^

SECTOR: Power generation   KEY BENEFITS: Bespoke solution Limited space   PROJECT: ALE designed a bespoke solution for the installation of power generation equipment at a biomass power plant in Pontevedra, Spain. The power generation items’ installation was part of a project to modernise a pulp mill at the plant. ALE’s experience of working on […]

transportation of a house on SPMTs

Case Study

^

SECTOR: Civil KEY BENEFITS: Minimised disruption Swift operation Third party co-ordination   PROJECT: ALE’s precision and accuracy enabled them to perform the swift relocation of an entire house, weighing 650t, in Alphen aan den Rijn, Netherlands. The structure of the house meant a very accurate lifting method was needed as well as a considerable amount […]

power generation lifting and installation of item

Case Study

^

SECTOR: Power generation   KEY BENEFITS: Minimised downtime Co-ordination with third parties   PROJECT: ALE completed the replacement of a generator at one of South Africa’s largest power stations, helping to get the unit back online and running more efficiently with minimal downtime. The work involved the removal and transportation of the existing generator core, […]

(Page 1 of 74) Next Page »

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Gender Pay Gap Report | Anti-modern Day Slavery Statement | Terms Of Website Policy | ALE Terms & Conditions