Case Studies

Sector:

Service:

Equipment:

Location:


Case Studies

Showing 714 Case Studies

Case Study

^

SECTOR: Shipyards   KEY BENEFITS: Flexibility Quick mobilisation   PROJECT: ALE adapted their engineering plans to an unexpected change in water levels, enabling them to still complete the load-out of a tanker on schedule in the Netherlands. The water level was discovered to be too low to be able to perform the load-out to the […]

Case Study

^

SECTOR: Civil   KEY BENEFITS: Minimal disruption Reduced schedule   PROJECT: ALE has completed the swift replacement of a railway bridge, minimising disruption and ensuring the railway lines could be reopened within just 48 hours. ALE used 28 axle lines of SPMT in a configuration of 2 x 2 file 14 to remove the old […]

Case Study

^

SECTOR: Ports   KEY BENEFITS: Minimised disruption Reduced mobilisation costs Flexibility   PROJECT: ALE has utilised its engineering expertise to minimise disruption while completing the cost-effective transportation of two container cranes, weighing 1,327t each, at the Terminal Pacífico Sur in Valparaíso, Chile. Mobilisation costs on the operation were reduced as ALE was able to draw […]

skidding and lifting of module on skid tracks in Portugal

Case Study

^

There is no excerpt because this is a protected post.

flexibility making yacht build and transportation easier

Case Study

^

SECTOR: Shipyards   KEY BENEFITS: Reduced costs Increased flexibility   PROJECT: ALE has reduced costs and provided greater flexibility with the transportation of a fishing trawler, weighing 550t, at a shipyard in Harlingen, the Netherlands. The trawler was built in a nearby construction hall on steel supports, then transport cradles were installed under the trawler. […]

Case Study

^

SECTOR: Power generation   KEY BENEFITS: Complex route Innovative equipment Increased safety In-house logistics expertise   PROJECT: ALE has negotiated steep gradients, bridges and other challenges to complete the transportation of two transformers. From the port of Inverness, the transformers, weighing 193t each, were transported along a complex route to Tomatin Substation in Scotland, UK, […]

Case Study

^

SECTOR: Power generation   KEY BENEFITS: Turnkey solution Extensive equipment fleet Co-ordination with several third parties   PROJECT: ALE has provided a full turnkey solution, deploying a range of different equipment and multiple techniques for the complex transhipment, discharge and transportation of a gas turbine. The turbine, weighing 336t, was transported across a challenging route […]

Case Study

^

SECTOR: Renewables – Wind   KEY BENEFITS: Innovative bespoke solution Reduced schedule Reduced costs Effective coordination with third parties   PROJECT: ALE’s innovative mindset has enabled them to complete a challenging wind tower transportation in the most effective way possible. ALE successfully transported nine offshore wind tower sections, weighing 156t each, to Campbeltown Harbour, Scotland. […]

Case Study

^

SECTOR: Industrial/Power   KEY BENEFITS: Short notice mobilisation Extensive transportation fleet Reduced costs Reduced schedule Co-ordination with third parties   PROJECT: After mobilising at short notice, ALE has utilised its extensive transportation fleet to reduce time and costs for the 365m transportation of an evaporator and economizer in the UK. ALE performed the transportation of […]

crankshaft exchange

Case Study

^

SECTOR: Shipyards   KEY BENEFITS: Multiple removal and installation techniques Coordination with several project teams Short notice mobilisation Reduced schedule Bespoke solution   PROJECT: ALE has used multiple techniques to swiftly perform two operations simultaneously within a highly challenging environment. The exchange of a crankshaft, weighing 9.2t, and the removal and re-installation of a rotor, […]