Overview

ALE has successfully completed the transportation of CCGT modules and casings from Ellesmere Port to Carrington Power Station. ALE received the equipment at Ellesmere Port and delivered to site via a RORO barge using SPMT trailer.

The ALE project team led and managed the design and build of a bespoke mooring facility on the site in accordance with the local canal authorities.

Services required

The HRSGs each weighing 220t, and the casings weighing 70t, were transported using a 20 row 2 file SPMT.  The AK912 was used to position casings at the Carrington site.