Crane relocation for 3 STS cranes in Valencia, Spain  

 

Overview

ALE has performed the relocation of two 850t and 550t container cranes inside the TCV terminal and the transportation of a new 1,470t container crane from the assembly area to its final position inside the TCV terminal in Valencia.

 

Services Required

The container crane relocation was executed using 48 axle lines of SPMT. They were transported 100m within the dock, supported by brackets on the transport beams supplied by ALE. Each transport move took approximately one hour.

The container crane, weighing 1,470t, was transported using 68 axles lines of SPMT and transport beams. The crane was transported 1,000m from its initial location in the assembly area to its final position on the rails, inside the TCV terminal in Valencia. The transport was completed in four hours.

 

 

 

Recolocación de 3 grúas STS en Valencia, España

Resumen

ALE ha realizado la recolocación de dos grúas portacontenedores de 850t y 550t y el transporte de una grúa portacontenedores de 1.470t dentro de la terminal de TCV, en Valencia.

 

Servicios Requeridos

La recolocación de las grúas se llevó a cabo mediante 48 líneas SPMT. Para el transporte se apoyó cada grúa mediante ménsulas sobre las vigas de transporte suministradas por ALE.  Los movimientos de las grúas se llevaron a cabo en el muelle y con recorridos aproximados de 100m y duración de una hora.

El transporte de la grúa de 1.470t se llevó a cabo mediante 68 líneas SPMT y vigas de transporte. La grúa se transportó 1.000m desde su posición inicial en el área de montaje hasta su posición final sobre raíles en la terminal de TCV en Valencia. El transporte se completó en 4 horas.