Hydraulic turbine parts transportation to the Laúca Hydropower Plant, Angola 

Overview

ALE collaborated with the company OREY to transport parts of a hydraulic turbine from Luanda 430km to the Laúca Hydropower Plant in Angola.

 

Services Required

ALE used a ballasted prime mover and drawbar with 6 axle lines of conventional trailers to move the turbine components.

ALE was faced with the challenge of transporting the largest item, weighing 87t and measuring 6.5m x 7m, through certain sections of the route. This included passing through villages and along narrow roads, as well as through a long, narrow tunnel comprising of bends with up to 300mm clearance on each side.

 

 

Transporte de equipo pesado a la Central Hidráulica de Laúca, Angola

Resumen

ALE colaboró con la empresa OREY en el transporte de partes de una turbina hidráulica desde Luanda hasta la Central Hidráulica de Laúca a unos 430km de distancia.

 

Servicios Requeridos

ALE realizó el transporte de los diferentes componentes de la turbina mediante una cabeza tractora con lastre y lanza con seis líneas de tráilers convencionales.

La pieza de mayor envergadura, de 87t, tenía unas medidas de 6,5m x 7m, lo que complicó el transporte por algunos de los tramos de la ruta que incluía pasos por poblaciones, carreteras estrechas y varios kilómetros de túnel con curvas que apenas permitían tener 300mm de holgura a cada lado. Pese a las dificultades, el transporte se llevó a cabo con éxito en el plazo previsto.

Share Button

  • Hydraulic turbine parts transportation to the Laúca Hydropower Plant, Angola 

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti-modern Day Slavery Statement | ALE Terms & Conditions