ALE has installed two gas turbine generators, weighing 300t each, at the Talkha and Nubaria Power Stations, Egypt.

 

Services Required

ALE were contracted to mobilise the equipment, including a mobile crane and Lift ‘n’ Lock gantry system. The Lift ‘n’ Lock was used to lift and install the gas turbine generators within the turbine hall. As there was limited space available inside the turbine hall, ALE utilised two different methods to install the gas turbine generators onto the foundations. This included the Lift ‘n’ Lock gantry system along with jacking and skidding.

Share Button

  • Installation of gas turbine generators at Talkha and Nubaria Power Stations, Egypt

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Gender Pay Gap Report | Anti-modern Day Slavery Statement | Terms Of Website Policy | ALE Terms & Conditions