Jalilah B Field Development Project, UAE

Overview

ALE has successfully completed the weighing, transportation and load-out of a boat landing, weighing 150t, and jacket, weighing 414t.

Services Required

The jacket was weighed using 200t load cells and jacks. The heavylift items were then transported using 44 axle lines of SPMTs and loaded onto a barge through four stages of ballasting using ALE ballast and de-ballast pumps.