Kumang and Tangga Barat Development project, Malaysia

ALE was contracted to weigh and load-out 16 modules for the Kumang and Tangga Barat Development project in Johor, Malaysia.

The modules consisted of topsides, wellheads, living quarters, helidecks and telecom towers ranging from 200te to 2000te. ALE were responsible for the engineering works, weighing, jacking, shifting, load-out and barge ballasting for the whole project.

The first phase was completed in 2009 and saw ALE weigh and load-out 7 of the modules. The final 9 modules were then weighed and loaded-out during a two week consecutive operation in May 2010. The modules comprised of six wellheads ranging from 1200te to 1500te, two bridges and one helideck ranging from 150te to 350te.

Share Button

  • Kumang and Tangga Barat Development project, Malaysia

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti-modern Day Slavery Statement | ALE Terms & Conditions