Your Javascript is switched off and this website requires Javascript to function correctly, therefore you are viewing a version with reduced functionality.

Launching of Colastine River, Argentina

ALE successfully completed the last launching for a 526 metre concrete bridge which spans the Colastine River in Argentina.

The bridge is supported by nine piles of reinforced concrete, and the operation was comprised of 30 launchings. ALE used a pulling system composed of two 500te capacity hydraulic units.

Share Button

  • Launching of Colastine River, Argentina

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Gender Pay Gap Report | Anti-modern Day Slavery Statement | Terms Of Website Policy | ALE Terms & Conditions