Your Javascript is switched off and this website requires Javascript to function correctly, therefore you are viewing a version with reduced functionality.

Load-out of 37,000t Wheatstone Project topside, South Korea

Overview

ALE has loaded-out one of the world’s largest single integrated topsides in Okpo-Dong, South Korea.

The Chevron-operated Wheatstone Project’s 37,000t topside was jacked to a height of 25m in just over seven hours using ALE’s Mega Jack system.

 

Services Required

ALE executed the load-out using the pulling technique with 10 900t capacity strand jacks.

ALE also installed and operated a primary ballasting system on the largest barge in the world, Heerema’s H851, and performed a 3D survey of the operation.

The monitoring of the ballasting and barge levelness during this massive operation was measured and recorded by ALE’s integrated ‘real time’ monitoring systems. Management of the load-out phases from one central control room ensured operational fluency.

Share Button

  • Load-out of 37,000t Wheatstone Project topside, South Korea

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Gender Pay Gap Report | Anti-modern Day Slavery Statement | Terms Of Website Policy | ALE Terms & Conditions