Load test between two piles in Dunkirk, France

 

Overview:

ALE has performed a load test of static lateral load between two marine pilings at the LNG terminal in Dunkirk, France. The test load weighed 300t.

 

Services required:

The piles of 10.5m in diameter and a separation of 50m were tested in a step test to reach 3,024 kN between the heads of the piles. For this purpose, ALE needed a lifting unit HLS5000 arranged horizontally on the head of one of the piles. On the other pile, a passive anchor SJ500 was attached by a cable loop.

 

Prueba de carga entre dos pilotes en Dunkerque, Francia

 

Resumen:

ALE ha realizado  una prueba de carga lateral estática entre dos pilotes marinos de la terminal Metanera de Dunkerque.

 

Servicios requeridos:

Los pilotes de 10.5m de diámetro, y una separación de 50m se comprobaron en una prueba escalonada hasta llegar a los 3,024kN entre las cabezas de los pilotes.  Para ello se necesitó una unidad de izado HLS5000 dispuesta horizontalmente en la cabeza de uno de los pilotes. En el otro pilote se dispuso un anclaje pasivo SJ500, unido por una madeja de cables. La prueba de carga fue de 300t.