Load-out and transportation of three marine superstructures, Mexico

Overview:

ALE has successfully performed the load-out and transportation of three marine superstructures ranging from 240t – 305t.

 

Services Required:

A piles set, weighing 240t, and two middle superstructures, weighing 240t and 305t, were loaded out and transported at API Dos Bocas in Tabasco, Mexico.

 

40 axle lines of SPT were configured, alongside two separated table and two powerpacks across two days. The piles set was unloaded and transported to dockside on the SPTs in one working day. For the two middle superstructures, the transportation and load-out took one day for each superstructure.

Share Button

  • Load-out and transportation of three marine superstructures, Mexico

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Gender Pay Gap Report | Anti-modern Day Slavery Statement | Terms Of Website Policy | ALE Terms & Conditions