Port operations, transport, offloading and pre-pop crane package for the Waainek wind energy project, South Africa

 

Overview

ALE has completed the port operations and full TCI package (transport, cranes and installation) for eight V112 3MW 84HH wind turbine generators (WTGs) for the Waainek wind energy project in the Eastern Cape.

 

Services Required

For this operation, ALE was responsible for the offloading on site, at the turbine foundations, as well as the handling of components on the various crane pad locations. ALE was also responsible for the dismantling, relocation and erection of the LG 1750 main crane on the Waainek wind energy project.

The components were offloaded and handled using a 250t crawler crane, a 90t mobile crane and a 40t mobile crane.

These components were then delivered and offloaded at the Waainek wind energy project site.