Pulling of jacket and deck of ONEL-A platform, Mexico

 

Overview:

ALE has successfully performed the load-out of a jacket, weighing 1,200t, and deck, weighing 3,500t, of the ONEL-A platform inside the EVYA facilities at Dos Bocas Tabasco.

 

Services Required:

The  was carried out from its original construction site to Boabarge, Mexico using a pulling system. Two strand jacks were used for the jacket and three strand jacks for the deck. The jacket and deck were pulled 65m and the job was completed within 16 hours.