ALE has performed the relocation of several structures, weighing 5t-240t, inside a fabrication yard in Veracruz, Mexico.

 

Services Required

In order to perform the relocation, up to 20 axle lines of SPT were used to manoeuvre the various structures. They were configured in numerous ways, depending on the weights of the structures being transported.

The heaviest and most challenging structure, weighing 240t, was a drive frame in four pieces.

The project was completed in two months.