Replacement of Railway Bridge, Belgium

ALE completed the removal and replacement of the Paleizenstraat railway bridge.ALE utilised 12 axles of SPMT to remove the existing 160te bridge. ALE then replaced the  infrastructure with two single rail concrete bridges, weighing 160te each, using various configurations of SPMT’s and a support structure.

Share Button

  • Replacement of Railway Bridge, Belgium

© 2018 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti-modern Day Slavery Statement | ALE Terms & Conditions