Overview

ALE has performed the onsite transportation of a reactor, weighing 160t, at the Atyrau Oil Refinery, Kazakhstan

 

Services Required

ALE utilised conventional trailers to move the 160t reactor 300m onsite.

The job required in-depth preparation and took five months to prepare. The route involved negotiating a low piperack and required ALE to go underneath the piperack. In order to overcome this, ALE performed simulations of the passage under the low piperack and suggested an excavation process to the client.

ALE performed the site move in 40 minutes.