Your Javascript is switched off and this website requires Javascript to function correctly, therefore you are viewing a version with reduced functionality.

Super M2 Rig Hull, UAE

ALE carried out engineering works for the sea-fastening, ballasting, load-out and float-off of the Super M2 Rig Hull using a semi-submersible vessel.

ALE’s team of naval architects and structural engineers provided engineering supervision, mooring calculations, barge deck strength analysis, semi-submersible longitudinal frame analysis, ballast calculations for roll-on and float-off, bollard pull calculations, sea-fastening calculations, semisubmersible stability analysis and marine management.

Following on from the engineering works, ALE then successfully completed the transportation, load-out and float-off of the 5,250t Super M2 Rig Hull 109.

Share Button

  • Super M2 Rig Hull, UAE

© 2019 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti-modern Day Slavery Statement | ALE Terms & Conditions