TPDP-A topside, Vietnam

ALE performs ballasting and load-out for TPDP-A topside project in Vietnam.

The 1,488te Topaz-A topside was moved from PTSC fabrication yard to the quayside using SPMTs and then loaded-out onto the barge, which was moored against the jetty.