Transportation and installation of gas turbine generators and HP drums, UAE

 

Overview

ALE has transported and installed two gas turbine generators and two HP drums for Shuweihat S3 IPP in Abu Dhabi.

 

Services Required

ALE received the heavylift items, with weights ranging from 113t – 196t, at the Mina Zayed Port, where they were transported to the laydown area. These were then loaded onto a barge and transported to the Shuweihat S1 jetty.

The items were then transported from the S1 jetty to the S3 IPP site using SPMTs.

Once they arrived at the S3 IPP site, they were installed onto their foundations using a jack and skid system.

Share Button

  • Transportation and installation of gas turbine generators and HP drums, UAE

© 2018 ALE | Acceptable Use Policy | Cookie Policy | Privacy Policy | Terms Of Website Policy | Anti-modern Day Slavery Statement | ALE Terms & Conditions