ALE has successfully completed the weighing, transportation and load-out of module M4, weighing 2,283.65t, as part of the Prelude Floating LNG project.

Services Required

Firstly, the M4 module was weighed using ALE’s 600t jacks and load cells. The module was then transported from the DryDocks World assembly yard to the quayside. Here, it was loaded-out onto the Korea Express SPB1, using 116 axle lines of SPMT.