ALE performed the transportation and installation for West Burton power station.

The 18 items, which comprised steam and gas turbines, generators and transformers, were received at the Port of Hull and barged down the River Trent to a jetty at Cottam Power Station. They were then transshipped to a girder frame trailer for the final 6 mile road journey to the station, a route which included narrow country lanes passing through small villages. Once at the site,
each piece was transshipped back to SPMT, transported through site and installed.