Array ( [0] => WP_Term Object ( [term_id] => 52 [name] => Abnormal Load Transport [slug] => abnormal-load-transport [term_group] => 0 [term_taxonomy_id] => 54 [taxonomy] => services [description] => [parent] => 0 [count] => 94 [filter] => raw )[1] => WP_Term Object ( [term_id] => 88 [name] => Africa [slug] => africa [term_group] => 0 [term_taxonomy_id] => 90 [taxonomy] => location [description] => [parent] => 0 [count] => 32 [filter] => raw )[2] => WP_Term Object ( [term_id] => 6 [name] => Minerals & Metals [slug] => minerals-metals [term_group] => 0 [term_taxonomy_id] => 8 [taxonomy] => sectors [description] => [parent] => 0 [count] => 22 [filter] => raw )[3] => WP_Term Object ( [term_id] => 70 [name] => Transportation [slug] => transportation [term_group] => 0 [term_taxonomy_id] => 72 [taxonomy] => equipment [description] => [parent] => 0 [count] => 263 [filter] => raw ))

Complex route overcome to transport Guinea’s largest and heaviest ever items

Key Benefits:

Record-breaking transportation

Challenging route

Bespoke solution

Minimised disruption

Project:

Challenged with the heavy haulage transportation of fifteen mining modules, including the largest and heaviest items ever transported in Guinea, ALE needed to design a bespoke solution to overcome the route’s various obstacles.

ALE collaborated with Bolloré Logistics, who led the project, to complete the abnormal load transport from the Port of Kamsar to the new Kamsar bauxite plant in Guinea in two stages.

First, three car dumper modules were unloaded using 12 axle lines of SPMT. In the second stage, 12 stacker reclaimer modules were unloaded using 24 axle lines of SPMT. For the transportation of the longest and bulkiest equipment, turn tables were used together with the SPMTs.

The record-breaking aspect of the operation came in the second stage. One of the modules, weighing 220t, was the heaviest item ever transported in Guinea, and the boom bucket, measuring 46m long and 15m wide, was the largest item ever transported in Guinea. In both cases the modules were unloaded, stored in stools in the port, and then transported to a laydown area within the plant.

ALE had to overcome various obstacles on the 5km transportation route, including train tracks, two temporary bridges, turns of up to 90 degrees, and slopes with gradients of more than 7%. The biggest challenge was the existing train tracks. ALE’s solution was to design a set of link span beams. These could be assembled and disassembled quickly, which minimised the disruption to rail traffic.

While completing another record-breaking project, the experience of ALE’s team enabled them to provide bespoke equipment for the challenges of this unique operation. This efficient solution minimised disruption to the client, ensuring they were able to continue other works on the project.

Superada compleja ruta para las piezas más grandes y pesadas transportadas en Guinea

SECTOR:

Minería y metalurgia

ASPECTOS CLAVE:

Transporte récord

Ruta compleja

Solución personalizada

Interrupciones minimizadas

PROYECTO:

Al enfrentarse con el transporte pesado de quince módulos de minería, incluyendo las piezas más grandes y pesadas que se hayan transportado en Guinea, ALE necesitaba diseñar una solución personalizada que superase los diversos obstáculos de la ruta.

ALE en colaboración con Bolloré Logistics, quien lideró el proyecto, completó el transporte de cargas especiales desde el Puerto de Kamsar a la nueva planta de bauxita de Kamsar en Guinea en dos etapas. Primero, se descargaron tres módulos de car dumper utilizando 12 líneas de ejes de SPMT. En la segunda etapa, se descargaron 12 módulos pertenecientes al stacker reclaimer mediante 24 líneas de ejes de SPMT. Para el transporte de los equipos más largos y voluminosos, se utilizaron mesas de giro junto con los SPMT.

En la segunda etapa llegamos a la fase récord de la operación. Uno de los módulos, que pesaba 220 toneladas, fue la pieza más pesada transportada en Guinea, y boom bucket con 46 m de largo y 15 metros de ancho, fue el artículo más voluminoso transportado en Guinea. En ambos casos, los módulos se descargaron, se almacenaron en stool en el puerto y luego se transportaron a un área de almacenamiento dentro de la planta.

ALE tuvo que superar diferentes obstáculos en la ruta de transporte de 5 km, incluyendo vías del tren, dos puentes temporales, giros de hasta 90 grados y pendientes de más del 7%. El mayor reto durante la ruta fue atravesar las vías de tren existentes, para lo cual ALE diseño vigas de salto que podrían ser ensambladas y desmontadas rápidamente, lo que minimizó la interrupción del tráfico ferroviario.

La experiencia del equipo de ALE les permitió proporcionar soluciones personalizadas a los retos de esta operación única, completando otro proyecto sin precedentes. Esta solución eficiente minimizaba las interrupciones al cliente, asegurándose así, que pudiesen continuar otros trabajos del proyecto.