Array ( [0] => WP_Term Object ( [term_id] => 46 [name] => Crane Lifting [slug] => crane-lifting [term_group] => 0 [term_taxonomy_id] => 48 [taxonomy] => services [description] => [parent] => 0 [count] => 91 [filter] => raw )[1] => WP_Term Object ( [term_id] => 72 [name] => Cranes [slug] => cranes [term_group] => 0 [term_taxonomy_id] => 74 [taxonomy] => equipment [description] => [parent] => 0 [count] => 135 [filter] => raw )[2] => WP_Term Object ( [term_id] => 8 [name] => Nuclear [slug] => nuclear [term_group] => 0 [term_taxonomy_id] => 10 [taxonomy] => sectors [description] => [parent] => 0 [count] => 6 [filter] => raw )[3] => WP_Term Object ( [term_id] => 102 [name] => South America [slug] => south-america [term_group] => 0 [term_taxonomy_id] => 104 [taxonomy] => location [description] => [parent] => 0 [count] => 45 [filter] => raw ))

Installation of liner module, Argentina

Overview

ALE has completed the installation of the third liner module at a nuclear power plant in Buenos Aires, Argentina.

Services Required

The module was installed at the CAREM 25 nuclear power plant in Lima. ALE installed the module using three cranes: a 1,200t capacity crawler crane, and 250t capacity and 95t capacity all terrain cranes.

ALE lifted the module from the assembly area at a 45m radius and installed it at a 60m radius. It took approximately one month to complete.

 

 

 

 

 

Explore our projects

Crane Lifting

Cranes

Nuclear