Array ( [0] => WP_Term Object ( [term_id] => 52 [name] => Abnormal Load Transport [slug] => abnormal-load-transport [term_group] => 0 [term_taxonomy_id] => 54 [taxonomy] => services [description] => [parent] => 0 [count] => 104 [filter] => raw )[1] => WP_Term Object ( [term_id] => 96 [name] => Europe [slug] => europe [term_group] => 0 [term_taxonomy_id] => 98 [taxonomy] => location [description] => [parent] => 0 [count] => 205 [filter] => raw )[2] => WP_Term Object ( [term_id] => 20 [name] => Renewables [slug] => renewables [term_group] => 0 [term_taxonomy_id] => 22 [taxonomy] => sectors [description] => [parent] => 0 [count] => 59 [filter] => raw )[3] => WP_Term Object ( [term_id] => 70 [name] => Transportation [slug] => transportation [term_group] => 0 [term_taxonomy_id] => 72 [taxonomy] => equipment [description] => [parent] => 0 [count] => 277 [filter] => raw ))

ALE helps GE to unveil and test world’s most powerful offshore wind turbine, France

KEY BENEFITS:

Multiple services through single contact

Flexible deployment

Increased safety

PROJECT:

Haliade-X 12 MW is the world’s most powerful offshore wind turbine, capable of powering 16,000 European households while saving carbon emissions equivalent to those of 9,000 vehicles per year. Featuring the world’s longest blades, it has a rotor span of 260m.

Following its launch, a number of heavylifting operations were required. The turbine’s two prototype nacelles, weighing several hundred tonnes, required transportation on site, while separately the yokes that position each blade during installation required load testing to ensure they could withstand the required load.

The clients called upon ALE to assist due to its expertise in engineering and supporting sequences of onsite lifts. Its role in providing turnkey turbine installation packages and load testing projects was also key to satisfying the clients’ needs.

Transportation of the first Haliade-X 12 MW nacelle took place at its factory in Saint-Nazaire, France. It was moved via SPMT approximately 200m, from the factory in which it was manufactured to the yard, forming part of the nacelle’s global unveiling ceremony.

Two nacelles in total were transported by ALE and then loaded onto barges for shipment to Rotterdam, the Netherlands and Blyth, UK. Here, each nacelle will form part of a test installation – one on land, one at sea – undergoing the certification and operational testing required to confirm their performance levels and reliability.

The weight of the nacelles was borne by 32 axle lines of SPMT in a 16 x 4 file configuration. A selection of load cells was used to perform the weighing operations. During down time, the SPMTs were made available for a selection of smaller lifting tasks on site, enhancing their value to the project as a whole.

Concurrent with the launch ceremony, ALE completed lift operations to test the yokes that are used to install the Haliade-X 12 MW blades at sea. The yokes – known as Blade Eagles – are 170t and have dimensions of 32m x 10.5m x 14m.

To perform this testing, ALE provided a 150t-capacity LR1600 crane and a load cell in slings. The scope of this testing was to lift the 50t blade using the Blade Eagles through a series of angles of maximum +15 degrees and minimum -30 degrees from horizontal, and also to perform various friction tests.

This testing lasted for three days in total, following which the blades were placed back into support frames and the Blade Eagles placed on the quay for later collection by a vessel. This was the first lift of the longest wind turbine blade in the world.

The Blade Eagle yokes will be used for all offshore installations of the Haliade-X 12 MW. The turbine as a whole will undergo testing with an aim of mid-2021 for its first commercial production – following which it will start to generate an annual gross energy of 67GWh at locations around the world.

Download pdf

ALE AYUDA A GE AL lanzamiento y testeo de LA TURBINA EÓLICA MARINA MÁS POTENTE DEL MUNDO, FRANCIA.

 

BENEFICIOS CLAVE:

Múltiples servicios a través de un solo contacto

Flexibilidad de movilización

Mayor seguridad

 

PROYECTO:

Haliade-X 12 MW es la turbina eólica marina más potente del mundo, capaz de alimentar a 16.000 hogares europeos mientras reduce emisiones de carbono equivalentes a las de 9.000 vehículos por año. Posee las palas más largas del mundo, con una capacidad de rotor de 260m.

Tras su puesta en marcha, las dos nacelles, que pesaban varios cientos de toneladas, requerían transporte in situ, mientras que los yugos que posicionaban cada pala durante la instalación requerían pruebas de carga para garantizar que pudieran soportar la carga requerida.

Los clientes acudieron a ALE debido a su experiencia en ingeniería y en secuencias de izados in situ.

El transporte de la primera góndola del Haliade-X de 12 MW tuvo lugar en su fábrica en Saint-Nazaire, Francia. Se trasladó empleando SPMT aproximadamente 200 metros, desde la fábrica en la que se fabricó hasta el astillero, siendo la presentación mundial de la góndola.

Dos nacelles fueron transportados en total por ALE y cargadas posteriormente en barcazas para su envío a Rotterdam, Países Bajos y Blyth, Reino Unido. Donde cada góndola formará parte de una instalación de prueba, una en tierra y otra en el mar, que se someterá a la certificación y las pruebas operativas necesarias para confirmar sus niveles de rendimiento y fiabilidad.

El peso de las góndolas fue soportado por 32 líneas de eje de SMPT en una configuración de 4x 16. Se utilizó una selección de celdas de carga para realizar las operaciones de pesaje. Durante el tiempo de inactividad, los SPMT se pusieron a disposición para una selección de tareas de elevación más pequeñas en el sitio, mejorando su valor para el proyecto en su conjunto.

Al mismo tiempo, ALE realizó pruebas de carga de los yugos que posicionarán cada pala del Haliade-X de 12 MW durante la instalación en el mar. Los yugos, llamados “Blade Eagles”, tienen un peso de 170t y sus dimensiones son 32m x 10.5 x 14m.

Para realizar estas pruebas, ALE proporcionó una grúa LR1600 de 150t de capacidad y balancines de izado con eslingas. El alcance de esta prueba era elevar la pala de 50t, usando los yugos, a través de una serie de ángulos de máximo +15 grados y mínimo -30 grados desde la horizontal, y también realizar varias pruebas de fricción

Esta prueba duró un total de tres días, después las palas se volvieron a colocar en su cama y se dejaron en el muelle para su posterior transporte en barco. Siendo este el primer izado de la pala de turbina eólica más larga del mundo.

Los yugos Blade Eagle serán utilizados para todas las instalaciones en alta mar del Haliade-X 12 MW. La turbina en su conjunto se someterá a pruebas con el fin de empezar su producción comercial a mediados de 2021, después de lo cual comenzará a generar una energía bruta anual de 67GWh en ubicaciones de todo el mundo.